1.4.0 (2026-11-09) Four languages and LizPack Enterprise - Interface in French, English, Spanish and Portuguese, with a language selector in the header; server messages and the diagnostic export are translated too. - Connection to a LizPack Enterprise portal with an API token: files, chunked uploads, validation and PostGIS layers. - Read-only token: validation allowed, write actions greyed out; they come back as soon as a write token is used. - Protected projects open to their owner and to the update group. - Redesigned Connection tab; the PostGIS banner gives the real reason. - "Fix in QGIS" after a validation. - Validation: basemaps (WMS, XYZ, WMTS, WCS, vector tiles, ArcGIS) no longer count in the mixed projections check. 1.3.0 (2026-10-21) Faster, sturdier publishing - Data goes straight to the server that hosts the instance, when it serves its own files. Projects are still validated by LizPack first. - Files already up to date on the server are not sent again. - A modified GeoPackage only sends the 4 MB blocks that changed. - GeoPackage, Shapefile and CSV are compressed on the way (2 to 3 times fewer bytes). - A lost request is retried, and an interrupted upload resumes where it stopped. Every block is checked on arrival. - Large uploads no longer fail on slow connections.
yes
geodonnee
2026-11-09T03:00:52.304638+00:00
3.16.0
3.99.0
None
no
Plugin Tags