0.1.3 - Stage 4 / all-in-one: new smood option "merge the remaining problematic elements during recovery", on by default from recovery cycle 2. A mesh whose last few small flow links sit on nodes smoothing may not move (fixed points, boundary vertices) now completes instead of failing with "mesh still violates dual criteria". The recovery cycle it starts at is an advanced setting; untick the option for the previous behaviour. - The smood progress table gained an N_MERGED column, so it is visible whether a recovery cycle merged anything. - Declares its Python dependencies (bluemesh2d, pyproj) in the metadata, so they are listed on the plugin page. - Clearer About text: the six stages as a bullet list. 0.1.2 - First public release. - The meshing library is installed from PyPI (bluemesh2d) instead of being bundled with the plugin: one dependency to install, and library fixes reach users without a plugin update. - One-click dependency installer: detects what is missing on load and installs it into QGIS's own Python, or into a plugin-managed virtual environment on PEP 668 systems (Debian/Ubuntu). - Qt6-compatible scoped enums throughout; requires QGIS 3.34 or newer. 0.1.0 - Initial release: 6-stage Processing workflow from bathymetry raster to UGRID NetCDF, plus an all-in-one algorithm.
yes
Token
2026-08-05T13:19:12.152831+00:00
3.34.0
3.99.0
None
no
Plugin Tags